Деловая сеть Белгород
Компании:3 357
Товары и услуги:6 181
Статьи и публикации:541
Тендеры и вакансии:106

Gas turbines OPRA OP16-ZA without operating time from storage

Gas turbines OPRA OP16-ZA without operating time from storage
99 000 000 р.
Купить
The industrial enterprise sells gas turbines OPRA OP16-ZA without operating time, from safe storage. Power is 1.85 MW.

The industrial enterprise sells gas turbines OPRA OP16-ZA without operating time, from safe storage.
Power is 1.85 MW.
These turbines are from the moment of production at the manufacturer's warehouse in Europe.
Once a year, storage extension works are performed on them.
The turbines were produced from November 2012 to January 2013.
Sale 30% below catalog price.
The gas turbines are equipped with 0.4 kV (50 Hz) Leroy Somer generators.
The turbines are designed to be housed in an easily prefabricated shelter.
If necessary, in the course of pre-sale preparation, the GTU block module can be modified for outdoor operation.
It is possible to additionally equip these gas turbines with waste-heat boilers with a capacity of 5.6 tons / hour.
We can also supply boilers in container design.
For the operation of the GTU, a fuel gas with a pressure of 1.2 MPa is required.
Completion of the offered gas turbines - send on request.
Specification of the proposed GTU - send on request.
We work with customers from any country in the world.
All questions will be answered by a consulting engineer.
Please contact by WhatsApp +79788975009 or Telegram +380968491702

посмотреть все (100)

Другие товары и услуги компании:

Selling second-hand SGT400 gas turbine. Manufactured in 2014. Operating time - 6000 hours. The condition is perfect. Application - power plant. Fuel - dual fuel (natural gas / diesel)
452 400 000 р.
Selling SGT400 Siemens gas turbine engine. The SGT-400 offer includes a complete set (power turbine + transition channel + gas generator). Availability - 3 sets available; Operating hours "0";
587 730 000 р.
Proposal of services from an operating company for the development and manufacture of Test stands, test systems and equipment for long-term control tests of gas turbine engines.
240 000 000 р.
Custom-made 6 MW gas turbine power plant. Condition: new equipment. Completeness: complete set.
350 000 000 р.
Restoration of heat-resistant coatings of blades and nozzles of gas turbine engines of gas turbine engines.
42 000 р.
Service maintenance of gas turbine power plants. Installation of gas turbine engines at a regular place of operation. Setting up the instrumentation of a gas turbine power plant.
5 455 000 р.
Информация о продавце
Ремонт газовых промышленных турбин GE, Siemens, Rolls-Royce, Solar. Изготовление испытательного оборудования. Продажа запчастей для промышленных газовых турбин GE, Siemens, Rolls-Royce Avon, Solar.
×